Managing reprocessing jobs
In Pipelines, all reprocessing jobs of the last 30 days are displayed.
Prerequisites
You are assigned to the Admin role.
Starting a reprocessing job
Refer to Reprocessing the input history.
Viewing the details of a reprocessing job
Proceed as follows
Expand the row of the respective reprocessing job on the list in order to see its details.
You can expand and collapse the row by clicking the arrows on the left.
Statuses of a reprocessing job
A reprocessing job can have one of the following statuses:
Unknown
Started / Running
Canceled
Failed
Done
Completed with failures
The status only refers to the reprocessing job. To check whether the data was processed successfully, refer to the Processing Information menu or the Processing Logs/App Console of the corresponding pipeline.
Upscaling a running reprocessing job
To increase the performance of an already running reprocessing job, you can start an additional instance within it. Keep in mind that this action consumes additional RAM.
Proceed as follows:
While the reprocessing job is still running, you can click the
scale up icon on the right of the row.
On the dialog that opens, mind the warning about the additional RAM consumption and either confirm the upscaling or cancel it.
Canceling a reprocessing job
Proceed as follows
Click the
Cancel icon to cancel the reprocessing job.
→ The reprocessing job is canceled.